CLIENTS
The plant is completed by sinonine company, the design scale is 450tpd, the actual production capacity can reach 500tpd, plant operation early production of gold concentrate by flotation method, then design the size of the leaching production line, the final product is gold bullion.
FULL STORY
The production capacity of the beneficiation plant is 1800tpd, it is for cassiterite polymetallic sulfide ore.The crushing and screening stage of the production line is three stages and one closed process. After the change of the ore property, the water content of the mud increased, which affected the normal operation of the ore transportation, ore unloading, screening and other equipments, and then increased the washing equipment.
FULL STORY
The production line is designed to be 15000tpd, and the capacity can reach 20000tpd after expansion.
FULL STORY
The production line design and equipment manufacturing are synchronous, so total cost is low, the project construction organization is scientific, good economic benefit is realized.
FULL STORY
MORE